FAST FOUNDATIONS FOR GENERAL CONTRACTORS
The foundation crew that
never holds up the schedule.
Now Delivering Everywhere in Colorado
Less coordination. More momentum.
Forming, pouring, and cleanup aren’t your problem anymore
Panels show up pre-cured and ready to set, so framing crews can mobilize instead of waiting on concrete to gain strength. No forming, no pouring, no cleanup. No pump trucks or washouts.
Fewer trades on-site means less juggling and less mess for you. We improve efficiency by reducing on-site activities, including optional concrete damp proofing and insulation already integrated at the factory.
Warranty-backed, inspection-documented. Stamped engineer inspections and a multi-year warranty come standard on every install, cutting your callback risk and liability exposure.
What you get on every project
Five reasons GCs Prefer Fast Foundations
Contractor questions answered
What crew and equipment do I actually need to set these?
A mid-sized excavator, boom truck, or crane plus a small crew. Two workers and one operator can install 200+ linear feet in a day.
Do I have to wait on cure time before framing starts?
No. Panels arrive pre-cured and ready to set, so your framing crew can mobilize right away instead of waiting on concrete to gain strength.
How does this hold up in mountain-climate weather?
Concrete is poured off-site in a controlled environment, so cold-weather restrictions and rain delays that typically stall a pour don’t apply here.
Does this add more trades and coordination to my schedule?
It removes them. No on-site forming, pouring, or cleanup means fewer trades to manage and less coordination load overall.
What's backing the install if something goes wrong?
Every project includes pre- and post-install engineer inspections with stamped reports, documented concrete testing, and a multi-year warranty, which lowers your callback and liability exposure.